01 / MAX Ton · Unlocking untapped production

Your operation can produce more with the capacity it already has

Installed capacity sets the production potential. Realizing that potential means identifying what holds production back and closing those gaps to deliver additional tonnes and sustain those measurable gains over time.

José Luis Almeida

Mining and Operational Excellence

joseluis.almeida@farocg.com

02 / The context

The opportunity lies in your existing capacity

In this market, investing in more capacity isn’t always the highest-return decision. Often, the best return comes from unlocking the production your operation is already capable of delivering.

US$6,5/lb

copper price on the London Metal Exchange in November 2026, up 40% year to date

US$12.100/t

projected average for the next decade, according to J.P. Morgan (February 2026)

US$5,95/lb

cochilco’s forecast for 2027 (Q3 2026 report)

Gold is also trading at highs, at more than twice its 2021–2024 average.

03 / Six opportunities to capture

The capacity is there, but it doesn’t always translate into production

The gap between what the system can produce and what it actually produces reveals six opportunities.

01

Flow

bottlenecks that are hard to see without end-to-end visibility.

02

Plan

production schedules that don’t reflect actual constraints.

03

Time

brief stoppages and delays that no one records.

04

Method

waiting, rework and double handling.

05

Interface

delayed decisions across departments and shifts.

06

Standard

different ways of operating and greater variability.

04 / Targets met, tonnes still to capture

The indicators look good, but some tonnes are still missing

Mine

SIGNAL

The drilling and blasting plan is on track

GAP TO ADDRESS

Some metres are drilled outside the plan, and poor fragmentation reduces crushing performance

IMPACT

Blasting delays and lower throughput

Plant

SIGNAL

The overall availability KPI looks healthy

GAP TO ADDRESS

Critical equipment runs intermittently or below capacity

IMPACT

Lost tonnes only become visible in an hour-by-hour review

Support and management

SIGNAL

There is a weekly maintenance window

GAP TO ADDRESS

Production and maintenance renegotiate each case

IMPACT

Hours lost to scheduling conflicts are never recovered

05 / The capture engine

4 stages, 8 steps, verifiable tonnes

1. Map

3–4 weeks

make opportunities visible

1. Model the value stream · 2. Quantify the gap and set the target

Tools

Value tree, baseline, plan vs. actual

2. Focus

5–6 weeks

focus efforts where they create value

3. Prioritize improvement levers · 4. Design initiatives · 5. Manage risks

Tools

Impact vs. effort, owners, milestones, mitigation

3. Capture

6–8 months

turn analysis into tonnes

6. Build capabilities · 7. Capture additional tonnage

Tools

Control tower, visual management, benefits tracking

4. Sustain

Ongoing

embed a new way of operating

8. Embed the standard

Tools

Standard work, routines, continuous improvement

06 / Evidence

One mining company, four operations across three countries

Three open-pit operations (two in the United States and one in Argentina) and one underground operation (in Canada).

+13%

in production compared with the baseline

+36%

in cash flow compared with the baseline

Where the value came from

Mine

better haul truck utilization and longer MTBF for drill rigs.

Plant

higher metallurgical recovery on heap leach pads.

Geology

ore traceability and fewer metres drilled.

180 ideas per site · 30 initiatives prioritized · impact on cash flow

07 / Where the tonnes are

What we typically find in an operation

These are preliminary hypotheses. The diagnostic assessment validates the impact of each and how much additional tonnage can be captured.

Mine

  • Quality and ambition of the drilling, blasting and loading plan
  • Active management of bottlenecks in the load-and-haul fleet
  • Speed in resolving conflicts and addressing root causes

Plant

  • Plant KPIs tied to the value actually captured
  • Hidden constraints in crushing and grinding
  • Root causes of recurring deviations in recovery and grade

Support and management

  • More ambitious integrated planning across mine, plant and maintenance
  • Governance and rapid escalation of decisions across teams
  • Root cause analysis embedded in management routines
08 / Closing

How many tonnes separate what your operation can produce from what it actually produces?

The first step is a diagnostic assessment to estimate how many additional tonnes you can capture.

José Luis Almeida

Mining and Operational Excellence

joseluis.almeida@farocg.com

farocg.com · Santiago · Lima · Barcelona